Search Assessments
ITAC logo
Search Assessments
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91 matching assessments
ARC 2+ Digits Required
NAICS Fabricated structural metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Year Products Rec's Plant Energy $/yr Rec'd Savings $/yr
NT0035 2024 Structural steel beams 5 $122k $162k
AM0927 2024 Fabricated steel storage tanks and oilfield equipment 5 $314k $100k
SU0555 2024 Structural steel for buildings & bridges 15 $184k $115k
TR0057 2024 Fabricated structural metal 4 $106k $11k
KS2429 2024 Metal components parts 6 $235k $94k
AM0910 2024 Fabricated steel products 7 $126k $81k
LS2403 2023 Fabricated structural metal 4 $311k $13k
LE0556 2023 Steel structures 9 $777k $161k
UC2304 2023 Steel frames 8 $301k $146k
AM0875 2023 Custom metal products 7 $168k $34k
CO0746 2022 Steel/stainless steel 4 $123k $38k
SU0517 2022 Fabricated metal products 9 $100k $7.4k
LS2217 2022 Fabricated structural steel 6 $579k $9.0k
UL2202 2022 Industrial metal products 8 $388k $110k
MI0402 2022 Metal stamping and sheets 7 $109k $23k
LS2202 2021 Metal fabrication 10 $807k $119k
LS2201 2021 Metal fabrication 10 $101k $66k
WV0607 2021 Fabricated metal products 7 $106k $26k
OR0738 2021 Concrete molds and palletizing equipment 3 $561k $257k
NL0052 2020 Custom metal parts 6 $526k $25k