ITAC Assessment: SU0555
ITAC logo
ITAC Assessment: SU0555
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Structural Steel for Buildings & Bridges
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 72,000
ft2
Annual Production 3,118
ton
Production Hrs. Annual 5,330
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,700 743,051
kWh
Electricity Demand $56,504 4,129
kW-mo/yr
Electricity Fees $10,790 -
Natural Gas $8,980 1,379
MMBtu
LPG $26,874 798
MMBtu
Fuel Oil #1 $39,719 1,286
MMBtu
Other Gas $204 1
MMBtu
TOTAL YEARLY COSTS $183,772
RECOMMENDED SAVINGS* $115,164 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $923 - - - - - - $923
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,613 - - $2,613
-
kW-mo/yr
- - - -
03 2.4239: Eliminate or reduce compressed air usage $1,450 - $1,450
26,358
kWh
- - - - -
04 2.4322: Use or replace with energy efficient substitutes $2,049 $70 $1,238
22,500
kWh
$1,436
-
kW-mo/yr
$(-625.0)
-
MMBtu
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,994 $104 $1,994
36,251
kWh
- - - - -
06 2.7224: Reduce space conditioning during non-working hours $1,650 $115 - - $1,650
-
MMBtu
- - -
07 2.4322: Use or replace with energy efficient substitutes $362 $128 $72
1,314
kWh
$25
-
kW-mo/yr
- - - $265
08 2.7447: Install vinyl strip / high speed / air curtain doors $600 $292 - - $600
-
MMBtu
- - -
09 2.4221: Install compressor air intakes in coolest locations $603 $344 $603
10,967
kWh
- - - - -
10 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,795 $1,172 $1,795
32,633
kWh
- - - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $823 $1,347 $500
9,094
kWh
$305
-
kW-mo/yr
- - - $18
12 2.1321: Replace fossil fuel equipment with electrical equipment $61,520 $301,550 $(-5,073.4)
(-92,243)
kWh
- - $26,874
-
MMBtu
$39,719
-
MMBtu
-
13 2.6211: Conserve energy by efficient use of vending machines $101 $498 $101
1,840
kWh
- - - - -
14 2.7232: Replace existing hvac unit with high efficiency model $7,140 $35,125 $(-1,841.0)
(-33,473)
kWh
- $8,981
-
MMBtu
- - -
15 2.9114: Use solar heat to make electricty $31,541 $219,132 $31,541
573,480
kWh
- - - - -
TOTAL RECOMMENDED $115,164 $559,876 $32,380
588,721
kWh
$4,379
-
kW-mo/yr
$10,606
-
MMBtu
$26,874
-
MMBtu
$39,719
-
MMBtu
$1,206
TOTAL IMPLEMENTED $46,469 $257,339 $34,593
628,952
kWh
$305
-
kW-mo/yr
$10,631
-
MMBtu
- - $941
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs