Assessment Year | 2024 |
---|---|
Principal Product | Structural Steel for Buildings & Bridges |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 57 |
Plant Area |
72,000
ft2
|
Annual Production | 3,118
ton
|
Production Hrs. Annual | 5,330
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $40,700 | 743,051 |
kWh
|
$0.055 |
Electricity Demand | $56,504 | 4,129 |
kW-mo/yr
|
$13.68 |
Electricity Fees | $10,790 | - |
|
- |
Natural Gas | $8,980 | 1,379 |
MMBtu
|
$6.51 |
LPG | $26,874 | 798 |
MMBtu
|
$33.69 |
Fuel Oil #1 | $39,719 | 1,286 |
MMBtu
|
$30.89 |
Other Gas | $204 | 1 |
MMBtu
|
$204.28 |
TOTAL YEARLY COSTS | $183,772 | |||
RECOMMENDED SAVINGS* | $115,164 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,469 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Fuel Oil #1 Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.821: Pay bills on time to avoid late fees | $923 | - | - | - | - | - | - | $923 | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,613 | - | - |
$2,613
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,450 | - |
$1,450
26,358
kWh
|
- | - | - | - | - | |
04 | 2.4322: Use or replace with energy efficient substitutes | $2,049 | $70 |
$1,238
22,500
kWh
|
$1,436
-
kW-mo/yr
|
$(-625.0)
-
MMBtu
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,994 | $104 |
$1,994
36,251
kWh
|
- | - | - | - | - | |
06 | 2.7224: Reduce space conditioning during non-working hours | $1,650 | $115 | - | - |
$1,650
-
MMBtu
|
- | - | - | |
07 | 2.4322: Use or replace with energy efficient substitutes | $362 | $128 |
$72
1,314
kWh
|
$25
-
kW-mo/yr
|
- | - | - | $265 | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $600 | $292 | - | - |
$600
-
MMBtu
|
- | - | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $603 | $344 |
$603
10,967
kWh
|
- | - | - | - | - | |
10 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $1,795 | $1,172 |
$1,795
32,633
kWh
|
- | - | - | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $823 | $1,347 |
$500
9,094
kWh
|
$305
-
kW-mo/yr
|
- | - | - | $18 | |
12 | 2.1321: Replace fossil fuel equipment with electrical equipment | $61,520 | $301,550 |
$(-5,073.4)
(-92,243)
kWh
|
- | - |
$26,874
-
MMBtu
|
$39,719
-
MMBtu
|
- | |
13 | 2.6211: Conserve energy by efficient use of vending machines | $101 | $498 |
$101
1,840
kWh
|
- | - | - | - | - | |
14 | 2.7232: Replace existing hvac unit with high efficiency model | $7,140 | $35,125 |
$(-1,841.0)
(-33,473)
kWh
|
- |
$8,981
-
MMBtu
|
- | - | - | |
15 | 2.9114: Use solar heat to make electricty | $31,541 | $219,132 |
$31,541
573,480
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $115,164 | $559,876 |
$32,380
588,721
kWh
|
$4,379
-
kW-mo/yr
|
$10,606
-
MMBtu
|
$26,874
-
MMBtu
|
$39,719
-
MMBtu
|
$1,206 | ||
TOTAL IMPLEMENTED | $46,469 | $257,339 |
$34,593
628,952
kWh
|
$305
-
kW-mo/yr
|
$10,631
-
MMBtu
|
- | - | $941 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Fuel Oil #1 Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs