168,177
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LT8443 #04 Y:2026 | 04 | 2026 | Use solar heat to make electricty | $283,539 | $2,113,200 |
n/a
|
| LT8443 #03 Y:2026 | 03 | 2026 | Utilize higher efficiency lamps and/or ballasts | $263 | $713 |
n/a
|
| LT8443 #02 Y:2026 | 02 | 2026 | Use or replace with energy efficient substitutes | $60,922 | $686,315 |
n/a
|
| LT8443 #01 Y:2026 | 01 | 2026 | Reduce the pressure of compressed air to the minimum required | $155 | - |
n/a
|
| UD1131 #05 Y:2026 | 05 | 2026 | Reduce the pressure of compressed air to the minimum required | $902 | $4,296 |
n/a
|
| UD1131 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,166 | $953 |
n/a
|
| UD1131 #03 Y:2026 | 03 | 2026 | Preheat combustion air with waste heat | $16,940 | $25,320 |
n/a
|
| UD1131 #02 Y:2026 | 02 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $844 | - |
n/a
|
| UD1131 #01 Y:2026 | 01 | 2026 | Analyze flue gas for proper air/fuel ratio | $2,189 | - |
n/a
|
| MS0467 #04 Y:2026 | 04 | 2026 | Optimize plant power factor | $18,243 | $121,000 |
n/a
|
| MS0467 #03 Y:2026 | 03 | 2026 | Reduce the pressure of compressed air to the minimum required | $10,936 | - |
n/a
|
| MS0467 #02 Y:2026 | 02 | 2026 | Install vinyl strip / high speed / air curtain doors | $5,879 | $1,680 |
n/a
|
| MS0467 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,030 | $2,244 |
n/a
|
| WM0260 #05 Y:2026 | 05 | 2026 | Repair and eliminate steam leaks | $128 | $377 |
n/a
|
| WM0260 #04 Y:2026 | 04 | 2026 | Install occupancy sensors | $1,611 | $300 |
n/a
|
| WM0260 #03 Y:2026 | 03 | 2026 | Lower temperature during the winter season and vice-versa | $1,623 | - |
n/a
|
| WM0260 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,830 | $6,760 |
n/a
|
| WM0260 #01 Y:2026 | 01 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $20,053 | - |
n/a
|
| NT0062 #06 Y:2026 | 06 | 2026 | Lower temperature during the winter season and vice-versa | $803 | - |
n/a
|
| NT0062 #05 Y:2026 | 05 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,440 | $4,895 |
n/a
|