Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164,209

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1141 #04 Y:2025 Use most efficient type of electric motors $952 $3,005
OK1141 #03 Y:2025 Turn off equipment when not in use $3,373 -
OK1141 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,965 $12,558
OK1141 #01 Y:2025 Use solar heat to make electricty $20,142 $128,250
UD1113 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,836 $1,000
UD1113 #03 Y:2025 Eliminate or reduce compressed air usage $3,832 $4,200
UD1113 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $5,431 $1,312
UD1113 #01 Y:2025 Install outside air damper / economizer on hvac unit $11,142 $3,621
DL0259 #05 Y:2025 Use heat in flue gases to preheat products or materials $10,050 $40,000
DL0259 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,217 $5,500
DL0259 #03 Y:2025 Use heat from boiler blowdown to preheat boiler feed water $3,091 $13,000
DL0259 #02 Y:2025 Recover waste heat from equipment $11,620 $30,000
DL0259 #01 Y:2025 Change procedures / equipment / operating conditions $45,458 $19,000
MU0066 #09 Y:2025 Use solar heat to make electricty $59,971 $561,792
MU0066 #08 Y:2025 Use proper thickness of insulation on building envelope $116 $193
MU0066 #07 Y:2025 Use proper thickness of insulation on building envelope $251 $242
MU0066 #06 Y:2025 Install vinyl strip / high speed / air curtain doors $4,303 $4,440
MU0066 #05 Y:2025 Close holes and openings in building such as broken windows $189 $627
MU0066 #04 Y:2025 Replace existing hvac unit with high efficiency model $49,773 $560,225
MU0066 #03 Y:2025 Use photocell controls $302 $550