Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

166,685

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1163 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $82 -
OK1163 #06 Y:2025 Use computer programs to optimize hvac performance $25,417 $42,525
OK1163 #05 Y:2025 Clean and maintain refrigerant condensers and towers $1,973 $3,370
OK1163 #04 Y:2025 Replace existing hvac unit with high efficiency model $3,376 $5,665
OK1163 #03 Y:2025 Install occupancy sensors $884 $2,870
OK1163 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,052 $12,414
OK1163 #01 Y:2025 Use solar heat to make electricty $10,845 $62,586
NT0053 #06 Y:2025 Lower temperature during the winter season and vice-versa $1,592 -
NT0053 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,252 $2,157
NT0053 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $6,767 -
NT0053 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $12,473 $5,753
NT0053 #02 Y:2025 Optimize plant power factor $18,726 $25,437
NT0053 #01 Y:2025 Apply for tax-free status for energy purchases $41,635 $5,000
UW2510 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,923 $9,402
UW2510 #02 Y:2025 Add equipment/ operators to reduce production bottleneck $10,639,200 $32,000,000
UW2510 #01 Y:2025 Install compressor air intakes in coolest locations $1,701 $4,278
UD1126 #03 Y:2025 Pay utility bills on time $2,991 -
UD1126 #02 Y:2025 Meter recycled water (to reduce sewer charges) $9,848 $2,500
UD1126 #01 Y:2025 Change rate schedules or other changes in utility service $32,372 -
UD1125 #05 Y:2025 Install occupancy sensors $1,480 $1,208