Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,513

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM1004 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $13,554 $125
AM1004 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $160 $95
AM1004 #02 Y:2026 Apply for tax-free status for energy purchases $153,709 $15,000
AM1004 #01 Y:2026 Optimize plant power factor $8,060 $19,282
AM1003 #08 Y:2026 Use solar heat to make electricty $101,130 $815,980
AM1003 #07 Y:2026 Turn off equipment when not in use $8,900 $540
AM1003 #06 Y:2026 Reduce the pressure of compressed air to the minimum required $971 $9
AM1003 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,946 $1,830
AM1003 #04 Y:2026 Eliminate or reduce compressed air usage $360 $425
AM1003 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $761 $545
AM1003 #02 Y:2026 Meter recycled water (to reduce sewer charges) $40,935 -
AM1003 #01 Y:2026 Optimize plant power factor $5,740 $10,270
MI0478 #04 Y:2026 Use demand controller or load shedder $4,519 $18,392
MI0478 #03 Y:2026 Turn off equipment when not in use $14,074 $2,600
MI0478 #02 Y:2026 Lower temperature during the winter season and vice-versa $27,548 $480
MI0478 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $4,889 -
UL2615 #04 Y:2026 Use solar heat to make electricty $33,051 $262,820
UL2615 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,910 $18,224
UL2615 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,206 $1,761
UL2615 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,149 $525