ITAC Assessment: AM0964
ITAC logo
ITAC Assessment: AM0964
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product students
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 77,117
ft2
Annual Production 150
units
Production Hrs. Annual 2,547
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,537 461,488
kWh
Electricity Demand $26,411 2,401
kW-mo/yr
Natural Gas $7,008 639
MMBtu
TOTAL YEARLY COSTS $50,956
RECOMMENDED SAVINGS* $23,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,372 $15,151 $1,019
26,815
kWh
$1,353
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $4,064 $19,460 $1,479
39,928
kWh
$2,585
-
kW-mo/yr
-
03 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $2,267 $54,600 $961
25,161
kWh
- $1,306
-
MMBtu
04 2.9114: Use solar heat to make electricty $14,450 $391,560 $14,450
380,267
kWh
- -
TOTAL RECOMMENDED $23,153 $480,771 $17,909
472,171
kWh
$3,938
-
kW-mo/yr
$1,306
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs