ITAC Assessment: MA0332
ITAC logo
ITAC Assessment: MA0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product industrial ovens, flaking mills
NAICS
n/a
SIC 3567: Industrial Process Furnaces and Ovens
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 90,000
ft2
Annual Production 99
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,928 819,461
kWh
Natural Gas $46,628 6,029
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,032 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,032

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $2,291 - $2,291
26,671
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $1,059 $150 - $1,059
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $382 $100 $382
4,982
kWh
-
04 2.2437: Recover waste heat from equipment $300 $500 - $300
-
MMBtu
TOTAL RECOMMENDED $4,032 $750 $2,673
31,653
kWh
$1,359
-
MMBtu
TOTAL IMPLEMENTED $4,032 $750 $2,673
31,653
kWh
$1,359
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs