ITAC Assessment: IP0210
ITAC logo
ITAC Assessment: IP0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Wood Products
NAICS 321918: Other Millwork (including Flooring)
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 500,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 3,280
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,838 1,378,560
kWh
Electricity Fees $17,976 -
Natural Gas $28,568 4,660
MMBtu
TOTAL YEARLY COSTS $297,381
RECOMMENDED SAVINGS* $97,994 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $6,099 - $5,290
29,064
kWh
$809
-
MMBtu
02 2.4239: Eliminate or reduce compressed air usage $5,916 - $5,916
32,508
kWh
-
03 2.6211: Conserve energy by efficient use of vending machines $1,349 - $1,349
7,414
kWh
-
04 2.1123: Install automatic stack damper $73,852 $1,600 $73,852
405,781
kWh
-
05 2.2449: Recover heat from exhausted steam, hot air or hot water $8,048 $908 $8,048
44,222
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,730 $24 $2,730
15,000
kWh
-
TOTAL RECOMMENDED $97,994 $2,532 $97,185
533,989
kWh
$809
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs