ITAC Assessment: AM0166
ITAC logo
ITAC Assessment: AM0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product glass containers
NAICS
n/a
SIC 3221: Glass Containers
Sales Range $50
M
to 100
M
# of Employees 386
Plant Area 409,000
ft2
Annual Production 420,000,000
pieces
Production Hrs. Annual 8,496
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,799,024 39,709,555
kWh
Natural Gas $1,407,201 846,069
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $252,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $180,480 $174,160 - $180,480
-
MMBtu
02 2.3212: Optimize plant power factor $59,900 $29,000 $59,900
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,650 $7,630 $5,650
140,973
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,500 $500 $4,500
172,919
kWh
-
05 2.7144: Install spectral reflectors / delamp $1,630 $1,830 $1,630
38,980
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $500 $75 $500
8,499
kWh
-
TOTAL RECOMMENDED $252,660 $213,195 $72,180
361,371
kWh
$180,480
-
MMBtu
TOTAL IMPLEMENTED $64,900 $29,575 $64,900
181,418
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs