ITAC Assessment: MZ0157
ITAC logo
ITAC Assessment: MZ0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Electric heating elements and heaters
NAICS 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area 142,100
ft2
Annual Production 1,050,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $509,566 7,333,251
kWh
Electricity Demand $43,781 15,893
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,860 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,066

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2511: Insulate bare equipment $571 $601 $571
8,155
kWh
-
02 2.7446: Utilize sensors controlling roof and wall openings $1,077 $10,750 $361
5,157
kWh
$716
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $24,149 $30,133 $22,976
328,229
kWh
$1,173
-
kW-mo/yr
04 2.2622: Replace existing chiller with high efficiency model $2,223 $17,400 $2,223
31,755
kWh
-
05 2.4237: Substitute compressed air cooling with water or air cooling $3,840 $9,600 $3,840
54,857
kWh
-
TOTAL RECOMMENDED $31,860 $68,484 $29,971
428,153
kWh
$1,889
-
kW-mo/yr
TOTAL IMPLEMENTED $29,066 $50,483 $27,177
388,243
kWh
$1,889
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs