ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

21,821

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $797k 154k
MMBtu
$7.63
- Electrical $415k 8,348k
kWh
$0.076
- Natural Gas $225k 53k
MMBtu
$5.33

162,499

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 9.2k
MMBtu
6.0%
- Electrical $51k 899k
kWh
10.8%
- Natural Gas $19k -
MMBtu
-
Waste $8.5k
Productivity/Other $45k
TOTAL $142k
*May be negative reflecting an increased cost component required to save energy and costs overall

20,928

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $795k 156k
MMBtu
$7.48
- Electrical $413k 8,414k
kWh
$0.076
- Natural Gas $227k 54k
MMBtu
$5.25

73,906

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.1k
MMBtu
2.0%
- Electrical $17k 297k
kWh
3.5%
- Natural Gas $6.9k -
MMBtu
-
Waste $2.5k
Productivity/Other $15k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall