Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77,186

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0471 #05 Y:2026 Apply for tax-free status for energy purchases $31,195 -
WM0259 #04 Y:2026 Install adequate dryers on air lines to eliminate blowdown $1,514 $1,508
WM0259 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $46,427 $10,000
ORC023 #03 Y:2025 Reduce heat gain by window tinting $82 $197
ORC023 #02 Y:2025 Insulate glazing, walls, ceilings, and roofs $940 $1,661
ORC023 #01 Y:2025 Install occupancy sensors $140 $160
GT1000 #04 Y:2025 Adopt in-house material generation $88,408 $75,000
GT1000 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,557 $1,850
WM0256 #04 Y:2025 Utilize energy-efficient belts and other improved mechanisms $3,409 $210
WM0255 #01 Y:2025 Repair or replace steam traps $169,641 $20,561
NT0055 #07 Y:2025 Lower temperature during the winter season and vice-versa $2,034 -
NT0055 #06 Y:2025 Analyze flue gas for proper air/fuel ratio $2,718 $1,258
NT0055 #05 Y:2025 Optimize plant power factor $14,093 $21,896
NT0055 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $15,120 $5,753
NT0055 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $24,015 $28,383
MS0457 #03 Y:2025 Replace obsolete burners with more efficient ones $56,120 $321,000
MS0457 #01 Y:2025 Upgrade obsolete equipment $6,840 $29,366
OR0823 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $4,477 -
UW2518 #06 Y:2025 Replace fossil fuel equipment with electrical equipment $16,903 $102,300
UW2518 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,286 $28,047