ITAC Assessment: UF0611
ITAC logo
ITAC Assessment: UF0611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic Containers
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 326,000
ft2
Annual Production 350,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $989,196 20,669,385
kWh
Electricity Demand $1 43,483
kW-mo/yr
Electricity Fees $188,954 -
Natural Gas $67,890 10,843
MMBtu
Waste Disposal Costs
Water Usage $23,474 8,519
Tgal
Water Disposal $43,605 8,519
Tgal
TOTAL YEARLY COSTS $1,313,120
RECOMMENDED SAVINGS* $222,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $99,213 $111,120 $99,213
2,066,939
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $36,892 $25,400 $36,892
768,587
kWh
-
03 2.2623: Minimize condenser cooling water temperature $30,134 $5,900 $30,134
627,792
kWh
-
04 2.2694: Use highest temperature for chilling or cold storage $26,100 - $26,100
543,750
kWh
-
05 2.4133: Use most efficient type of electric motors $19,576 $19,104 $19,576
407,839
kWh
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,901 $7,320 $5,901
122,936
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,650 $720 $2,650
55,210
kWh
-
08 2.1222: Install turbulators $2,454 $3,750 - $2,454
-
MMBtu
TOTAL RECOMMENDED $222,920 $173,314 $220,466
4,593,053
kWh
$2,454
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs