The Assessment Recommendation Codes ARC is the ITAC system for classifying recommendation types.
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
See the Assessment Recommendation Codes ARC Manual for additional details.
|
TOP
|
ARC | Description | Recommendations Rec's | Recommended Rec'd $ Savings | Average Avg Payback PB | Implementation Imp Rate |
|---|---|---|---|---|---|---|
|
back
|
2.xxxx | 2.xxxx: ENERGY MANAGEMENT | 150k150,168 | $15k$14,684 avg | 1.9 yrs | 50.9% |
|
back
|
2.6xxx | 2.6xxx: Operations | 7.9k7,880 | $8.5k$8,481 avg | 0.7 yrs | 55.1% |
|
back
|
2.62xx | 2.62xx: EQUIPMENT CONTROL | 7.2k7,236 | $8.7k$8,685 avg | 0.7 yrs | 54.0% |
| selected | 2.623x | 2.623x: Equipment Automation | 2.1k2,068 | $8.0k$8,031 avg | 0.9 yrs | 48.7% |
| 2.6231 | 2.6231: UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | 1.0k1,027 | $13k$12,854 avg | 1.2 yrs | 43.7% | |
| 2.6232 | 2.6232: INSTALL SET-BACK TIMERS | 1.0k1,040 | $3.3k$3,271 avg | 0.7 yrs | 53.2% |