ITAC Assessment: GT0981
ITAC logo
ITAC Assessment: GT0981
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fuel Systems and Composites
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 854
Plant Area 769,000
ft2
Annual Production 12,719
units
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,882,815 18,752,547
kWh
Electricity Fees $12,582 -
Natural Gas $378,713 88,129
MMBtu
Other Gas $476 1
MMBtu
TOTAL YEARLY COSTS $2,274,586
RECOMMENDED SAVINGS* $684,458 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Gas Savings Personnel Changes Savings
01 2.8123: Pay utility bills on time $8,976 $200 - $8,500 $476
-
MMBtu
-
02 2.7224: Reduce space conditioning during non-working hours $10,928 $1,050 $10,928
109,282
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,995 $1,850 $19,895
198,947
kWh
- - $(-2,900.0)
04 2.7135: Install occupancy sensors $935 $461 $935
9,345
kWh
- - -
05 2.6211: Conserve energy by efficient use of vending machines $4,154 $2,205 $4,154
41,541
kWh
- - -
06 2.6231: Utilize controls to operate equipment only when needed $1,966 $1,875 $1,966
19,656
kWh
- - -
07 2.6212: Turn off equipment during breaks, reduce operating time $2,239 $9,917 $2,239
22,393
kWh
- - -
08 2.3212: Optimize plant power factor $3,926 $17,994 - $3,926 - -
09 2.9114: Use solar heat to make electricty $634,339 $8,779,600 $634,339
6,317,914
kWh
- - -
TOTAL RECOMMENDED $684,458 $8,815,151 $674,456
6,719,078
kWh
$12,426 $476
-
MMBtu
$(-2,900.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Other Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs