Assessment Year | 2024 |
---|---|
Principal Product | Fuel Systems and Composites |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 854 |
Plant Area |
769,000
ft2
|
Annual Production | 12,719
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,882,815 | 18,752,547 |
kWh
|
$0.10 |
Electricity Fees | $12,582 | - |
|
- |
Natural Gas | $378,713 | 88,129 |
MMBtu
|
$4.30 |
Other Gas | $476 | 1 |
MMBtu
|
$476.00 |
TOTAL YEARLY COSTS | $2,274,586 | |||
RECOMMENDED SAVINGS* | $684,458 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Other Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8123: Pay utility bills on time | $8,976 | $200 | - | $8,500 |
$476
-
MMBtu
|
- | |
02 | 2.7224: Reduce space conditioning during non-working hours | $10,928 | $1,050 |
$10,928
109,282
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,995 | $1,850 |
$19,895
198,947
kWh
|
- | - | $(-2,900.0) | |
04 | 2.7135: Install occupancy sensors | $935 | $461 |
$935
9,345
kWh
|
- | - | - | |
05 | 2.6211: Conserve energy by efficient use of vending machines | $4,154 | $2,205 |
$4,154
41,541
kWh
|
- | - | - | |
06 | 2.6231: Utilize controls to operate equipment only when needed | $1,966 | $1,875 |
$1,966
19,656
kWh
|
- | - | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,239 | $9,917 |
$2,239
22,393
kWh
|
- | - | - | |
08 | 2.3212: Optimize plant power factor | $3,926 | $17,994 | - | $3,926 | - | - | |
09 | 2.9114: Use solar heat to make electricty | $634,339 | $8,779,600 |
$634,339
6,317,914
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $684,458 | $8,815,151 |
$674,456
6,719,078
kWh
|
$12,426 |
$476
-
MMBtu
|
$(-2,900.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Other Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs