ITAC Assessment: SU0355
ITAC logo
ITAC Assessment: SU0355
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Consumer Products Packaging
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $100
M
to 500
M
# of Employees 225
Plant Area 169,000
ft2
Annual Production 108,900,000
units
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $315,231 8,251,530
kWh
Electricity Demand $232,061 17,927
kW-mo/yr
Natural Gas $532,676 108,179
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $906 - $324
8,100
kWh
$582
-
kW-mo/yr
- -
02 2.7122: Disconnect ballasts $6,431 $1,560 $3,699
97,344
kWh
$2,424
-
kW-mo/yr
- $308
03 2.2123: Insulate feedwater tank $267 $52 - - $267
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,150 $1,655 $6,150
153,743
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,005 $4,400 $4,618
115,440
kWh
$2,873
-
kW-mo/yr
- $514
06 2.4221: Install compressor air intakes in coolest locations $2,014 $1,136 $2,014
50,351
kWh
- - -
07 3.1161: Eliminate/reduce an operation $3,274 $2,400 $(-60.0)
(-1,500)
kWh
$(-466.0)
-
kW-mo/yr
- $3,800
TOTAL RECOMMENDED $27,047 $11,203 $16,745
423,478
kWh
$5,413
-
kW-mo/yr
$267
-
MMBtu
$4,622
TOTAL IMPLEMENTED $6,417 $1,707 $6,150
153,743
kWh
- $267
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs