Assessment Year | 2014 |
---|---|
Principal Product | Consumer Products Packaging |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $100 M to 500M |
# of Employees | 225 |
Plant Area |
169,000
ft2
|
Annual Production | 108,900,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $315,231 | 8,251,530 |
kWh
|
$0.038 |
Electricity Demand | $232,061 | 17,927 |
kW-mo/yr
|
$12.94 |
Natural Gas | $532,676 | 108,179 |
MMBtu
|
$4.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,047 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,417 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $906 | - |
$324
8,100
kWh
|
$582
-
kW-mo/yr
|
- | - | |
02 | 2.7122: Disconnect ballasts | $6,431 | $1,560 |
$3,699
97,344
kWh
|
$2,424
-
kW-mo/yr
|
- | $308 | |
03 | 2.2123: Insulate feedwater tank | $267 | $52 | - | - |
$267
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,150 | $1,655 |
$6,150
153,743
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,005 | $4,400 |
$4,618
115,440
kWh
|
$2,873
-
kW-mo/yr
|
- | $514 | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,014 | $1,136 |
$2,014
50,351
kWh
|
- | - | - | |
07 | 3.1161: Eliminate/reduce an operation | $3,274 | $2,400 |
$(-60.0)
(-1,500)
kWh
|
$(-466.0)
-
kW-mo/yr
|
- | $3,800 | |
TOTAL RECOMMENDED | $27,047 | $11,203 |
$16,745
423,478
kWh
|
$5,413
-
kW-mo/yr
|
$267
-
MMBtu
|
$4,622 | ||
TOTAL IMPLEMENTED | $6,417 | $1,707 |
$6,150
153,743
kWh
|
- |
$267
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs