ITAC Assessment: UA0303
ITAC logo
ITAC Assessment: UA0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Lawn Mower Engines
NAICS 333618: Other Engine Equipment Manufacturing
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 423
Plant Area 300,000
ft2
Annual Production 314,582
units
Production Hrs. Annual 5,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,154,134 14,380,384
kWh
Electricity Demand $141,332 29,817
kW-mo/yr
Electricity Fees $144,275 -
Natural Gas $211,102 17,421
MMBtu
TOTAL YEARLY COSTS $1,650,843
RECOMMENDED SAVINGS* $858,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $521,373 $7,311,060 $457,568
5,698,226
kWh
$11,546
-
kW-mo/yr
$52,259 -
02 2.7232: Replace existing hvac unit with high efficiency model $261,016 $1,003,778 $205,963
2,564,920
kWh
$28,890
-
kW-mo/yr
$26,163 -
03 2.7492: Use proper thickness of insulation on building envelope $68,468 $294,320 $28,988
361,002
kWh
- $3,229 $36,251
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $7,587 $750 $6,827
85,013
kWh
- $760 -
TOTAL RECOMMENDED $858,444 $8,609,908 $699,346
8,709,161
kWh
$40,436
-
kW-mo/yr
$82,411 $36,251
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs