| Assessment Year | 2026 |
|---|---|
| Principal Product | Lawn Mower Engines |
| NAICS | 333618: Other Engine Equipment Manufacturing |
| SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 423 |
| Plant Area |
300,000
ft2
|
| Annual Production | 314,582
units
|
| Production Hrs. Annual | 5,760
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,154,134 | 14,380,384 |
kWh
|
$0.080 |
| Electricity Demand | $141,332 | 29,817 |
kW-mo/yr
|
$4.74 |
| Electricity Fees | $144,275 | - |
|
- |
| Natural Gas | $211,102 | 17,421 |
MMBtu
|
$12.12 |
| TOTAL YEARLY COSTS | $1,650,843 | |||
| RECOMMENDED SAVINGS* | $858,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $521,373 | $7,311,060 |
$457,568
5,698,226
kWh
|
$11,546
-
kW-mo/yr
|
$52,259 | - | |
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $261,016 | $1,003,778 |
$205,963
2,564,920
kWh
|
$28,890
-
kW-mo/yr
|
$26,163 | - | |
| 03 | 2.7492: Use proper thickness of insulation on building envelope | $68,468 | $294,320 |
$28,988
361,002
kWh
|
- | $3,229 |
$36,251
-
MMBtu
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,587 | $750 |
$6,827
85,013
kWh
|
- | $760 | - | |
| TOTAL RECOMMENDED | $858,444 | $8,609,908 |
$699,346
8,709,161
kWh
|
$40,436
-
kW-mo/yr
|
$82,411 |
$36,251
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs