| Assessment Year | 2024 |
|---|---|
| Principal Product | Non-profit, Meal Preparation for Specialized Diets |
| NAICS | 624210: Community Food Services |
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 46 |
| Plant Area |
31,150
ft2
|
| Annual Production | 104,000
units
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $39,103 | 805,120 |
kWh
|
$0.049 |
| Electricity Demand | $46,018 | 2,412 |
kW-mo/yr
|
$19.08 |
| Electricity Fees | $10,763 | - |
|
- |
| Natural Gas | $21,290 | 2,161 |
MMBtu
|
$9.85 |
| TOTAL YEARLY COSTS | $117,175 | |||
| RECOMMENDED SAVINGS* | $37,802 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $25,045 | $262,465 |
$15,383
316,737
kWh
|
$9,662
-
kW-mo/yr
|
- | - | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,050 | $16,000 |
$3,050
62,000
kWh
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,175 | $2,196 |
$1,513
31,146
kWh
|
$1,662
-
kW-mo/yr
|
- | - | |
| 04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $767 | $5,075 |
$494
10,165
kWh
|
- |
$273
-
MMBtu
|
- | |
| 05 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,795 | - | - | - |
$1,795
-
MMBtu
|
- | |
| 06 | 2.7442: Keep doors and windows shut when not on use | $127 | $412 |
$6
127
kWh
|
- |
$121
-
MMBtu
|
- | |
| 07 | 2.8113: Purchase gas directly from a contract gas supplier | $3,843 | $800 | - | - | - | $3,843 | |
| TOTAL RECOMMENDED | $37,802 | $286,948 |
$20,446
420,175
kWh
|
$11,324
-
kW-mo/yr
|
$2,189
-
MMBtu
|
$3,843 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs