ITAC Assessment: GT0976
ITAC logo
ITAC Assessment: GT0976
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Commercial Refrigeration
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $100
M
to 500
M
# of Employees 509
Plant Area 247,000
ft2
Annual Production 175,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $918,515 11,956,959
kWh
Natural Gas $27,262 4,105
MMBtu
TOTAL YEARLY COSTS $945,777
RECOMMENDED SAVINGS* $331,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $12,289 $800 $12,289
159,607
kWh
-
02 2.7135: Install occupancy sensors $20,852 $2,185 $20,852
270,816
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $375 $200 $375
4,879
kWh
-
04 2.7224: Reduce space conditioning during non-working hours $20,799 $15,000 $20,799
269,852
kWh
-
05 2.3212: Optimize plant power factor $4,240 $13,403 - $4,240
06 2.9114: Use solar heat to make electricty $273,272 $5,081,734 $273,272
3,557,380
kWh
-
TOTAL RECOMMENDED $331,827 $5,113,322 $327,587
4,262,534
kWh
$4,240
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs