ITAC Assessment: GT0978
ITAC logo
ITAC Assessment: GT0978
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Lead-Acid Batteries
NAICS 335911: Storage Battery Manufacturing
SIC 3694: Electrical Equipment for Internal Combustion Engines
Sales Range $100
M
to 500
M
# of Employees 117
Plant Area 167,000
ft2
Annual Production 786,467
units
Production Hrs. Annual 4,160
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,827,935 25,538,658
kWh
Natural Gas $225,201 26,698
MMBtu
Other Gas $16,682 1
MMBtu
TOTAL YEARLY COSTS $2,069,818
RECOMMENDED SAVINGS* $395,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $14,430 $400 - $14,430 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $46,530 $1,850 $49,430
686,522
kWh
- $(-2,900.0)
03 2.7135: Install occupancy sensors $647 $390 $647
8,986
kWh
- -
04 2.6211: Conserve energy by efficient use of vending machines $292 $270 $292
4,061
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,328 $36,015 $23,328
324,000
kWh
- -
06 2.9114: Use solar heat to make electricty $310,364 $5,706,740 $310,364
4,336,196
kWh
- -
TOTAL RECOMMENDED $395,591 $5,745,665 $384,061
5,359,765
kWh
$14,430 $(-2,900.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs