ITAC Assessment: AM0962
ITAC logo
ITAC Assessment: AM0962
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Structural Steel
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $100
M
to 500
M
# of Employees 90
Plant Area 70,000
ft2
Annual Production 7,500
ton
Production Hrs. Annual 5,699
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,300 718,310
kWh
Electricity Demand $28,244 3,563
kW-mo/yr
Electricity Fees $12,437 -
Natural Gas $1,070 93
MMBtu
Waste Disposal Costs
Water Usage $6,702 1,112
Tgal
TOTAL YEARLY COSTS $107,753
RECOMMENDED SAVINGS* $102,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $8,340 $2,220 $6,200
74,500
kWh
- $2,140
02 2.8121: Apply for tax-free status for energy purchases $23,920 $15,000 - - $23,920
03 2.4224: Upgrade controls on compressors $5,160 $25,000 $4,180
50,300
kWh
$980
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,200 $2,449 $3,160
38,000
kWh
$678
-
kW-mo/yr
$362
05 2.3212: Optimize plant power factor $2,920 $3,290 - $2,920
-
kW-mo/yr
-
06 2.7145: Install skylights $1,950 $6,536 $1,950
23,400
kWh
- -
07 2.4314: Use synthetic lubricant $862 $406 $262
3,160
kWh
$600
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $312 - $145
1,750
kWh
$167
-
kW-mo/yr
-
09 2.9114: Use solar heat to make electricty $55,000 $363,450 $55,000
655,000
kWh
- -
TOTAL RECOMMENDED $102,664 $418,351 $70,897
846,110
kWh
$5,345
-
kW-mo/yr
$26,422
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs