ITAC Assessment: OR0504
ITAC logo
ITAC Assessment: OR0504
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Fibercement siding
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $50
M
to 100
M
# of Employees 88
Plant Area 145,000
ft2
Annual Production 120,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $688,460 20,088,000
kWh
Electricity Demand $161,872 3,190
kW-mo/yr
Electricity Fees $36,412 -
Natural Gas $1,313,458 125,047
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $230,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $64,300 $20,000 - - $64,300
-
MMBtu
-
02 2.1394: Replace steam jets on vacuum system with electric motor driven vacuum pumps $22,500 $44,500 $(-3,400.0)
(-95,400)
kWh
$(-1,400.0)
-
kW-mo/yr
$27,300
-
MMBtu
-
03 3.6192: Use a less expensive method of waste removal $84,100 - - - - $84,100
04 3.6192: Use a less expensive method of waste removal $28,000 - - - - $28,000
05 2.6242: Minimize operation of equipment maintained in standby condition $23,000 - $23,000
650,800
kWh
- - -
06 2.5194: Redesign process $6,100 $5,000 $5,200
152,400
kWh
$900
-
kW-mo/yr
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $2,500 $1,000 $2,500
70,000
kWh
- - -
TOTAL RECOMMENDED $230,500 $70,500 $27,300
777,800
kWh
$(-500.0)
-
kW-mo/yr
$91,600
-
MMBtu
$112,100
TOTAL IMPLEMENTED $109,800 $64,500 $19,600
555,400
kWh
$(-1,400.0)
-
kW-mo/yr
$91,600
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs