ITAC Assessment: UU0282
ITAC logo
ITAC Assessment: UU0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Steel Investment Casts
NAICS 331512: Steel Investment Foundries
SIC 3324: Steel Investment Foundries
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 18,900
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 4,192
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,205 1,659,780
kWh
Electricity Fees $54,647 -
Natural Gas $122,739 13,528
MMBtu
TOTAL YEARLY COSTS $357,591
RECOMMENDED SAVINGS* $74,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8124: Hire energy manager $11,100 $4,800 $18,100
166,000
kWh
- $12,200
-
MMBtu
$(-19,200.0) -
02 2.8113: Purchase gas directly from a contract gas supplier $21,900 $12,000 - - - - $21,900
03 2.8114: Change rate schedules or other changes in utility service $12,800 $9,600 - $12,800 - - -
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,300 $2,900 $7,300
67,000
kWh
- - - -
05 2.4221: Install compressor air intakes in coolest locations $790 $5,550 $790
7,200
kWh
- - - -
06 2.2442: Preheat combustion air with waste heat $3,270 $22,800 - - $3,270
-
MMBtu
- -
07 2.6218: Turn off equipment when not in use $9,350 $3,000 - - $9,350
-
MMBtu
- -
08 2.2511: Insulate bare equipment $3,030 $15,460 - - $3,030
-
MMBtu
- -
09 2.7229: Air condition only space necessary $1,130 $2,230 $1,130
10,400
kWh
- - - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $3,520 $9,240 $3,520
32,300
kWh
- - - -
TOTAL RECOMMENDED $74,190 $87,580 $30,840
282,900
kWh
$12,800 $27,850
-
MMBtu
$(-19,200.0) $21,900
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs