ITAC Assessment: SF0638
ITAC logo
ITAC Assessment: SF0638
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Fabricated Steel
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 68,200
ft2
Annual Production 4,800
ton
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,338 194,989
kWh
LPG $20,967 695
MMBtu
TOTAL YEARLY COSTS $128,305
RECOMMENDED SAVINGS* $83,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,654 $41 $1,654
3,004
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,021 - $12,677
23,026
kWh
- $(-656.0) -
03 2.7224: Reduce space conditioning during non-working hours $4,768 $2,490 $2,989
5,429
kWh
$1,779
-
MMBtu
- -
04 2.4226: Use / purchase optimum sized compressor $11,692 $25,000 $11,692
21,239
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,578 $13,681 $6,516
11,835
kWh
- $27 $35
06 2.9114: Use solar heat to make electricty $46,637 $70,732 $46,637
84,717
kWh
- - -
TOTAL RECOMMENDED $83,350 $111,944 $82,165
149,250
kWh
$1,779
-
MMBtu
$(-629.0) $35
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs