Assessment Year | 2025 |
---|---|
Principal Product | Fabricated Steel |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
68,200
ft2
|
Annual Production | 4,800
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $107,338 | 194,989 |
kWh
|
$0.55 |
LPG | $20,967 | 695 |
MMBtu
|
$30.16 |
TOTAL YEARLY COSTS | $128,305 | |||
RECOMMENDED SAVINGS* | $83,350 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,654 | $41 |
$1,654
3,004
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,021 | - |
$12,677
23,026
kWh
|
- | $(-656.0) | - | |
03 | 2.7224: Reduce space conditioning during non-working hours | $4,768 | $2,490 |
$2,989
5,429
kWh
|
$1,779
-
MMBtu
|
- | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $11,692 | $25,000 |
$11,692
21,239
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,578 | $13,681 |
$6,516
11,835
kWh
|
- | $27 | $35 | |
06 | 2.9114: Use solar heat to make electricty | $46,637 | $70,732 |
$46,637
84,717
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $83,350 | $111,944 |
$82,165
149,250
kWh
|
$1,779
-
MMBtu
|
$(-629.0) | $35 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs