| Assessment Year | 2025 |
|---|---|
| Principal Product | Fabricated Steel |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
68,200
ft2
|
| Annual Production | 4,800
ton
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $107,338 | 194,989 |
kWh
|
$0.55 |
| LPG | $20,967 | 695 |
MMBtu
|
$30.16 |
| TOTAL YEARLY COSTS | $128,305 | |||
| RECOMMENDED SAVINGS* | $83,350 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,654 | $41 |
$1,654
3,004
kWh
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,021 | - |
$12,677
23,026
kWh
|
- | $(-656.0) | - | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $4,768 | $2,490 |
$2,989
5,429
kWh
|
$1,779
-
MMBtu
|
- | - | |
| 04 | 2.4226: Use / purchase optimum sized compressor | $11,692 | $25,000 |
$11,692
21,239
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,578 | $13,681 |
$6,516
11,835
kWh
|
- | $27 | $35 | |
| 06 | 2.9114: Use solar heat to make electricty | $46,637 | $70,731 |
$46,637
84,717
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $83,350 | $111,943 |
$82,165
149,250
kWh
|
$1,779
-
MMBtu
|
$(-629.0) | $35 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs