| Assessment Year | 2026 |
|---|---|
| Principal Product | Animal Bedding , Wood Flour |
| NAICS | 321219: Reconstituted Wood Product Manufacturing |
| SIC | 2499: Wood Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 41 |
| Plant Area |
140,800
ft2
|
| Annual Production | 50,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $547,366 | 9,945,949 |
kWh
|
$0.055 | |
| Electricity Demand | $227,256 | 24,399 |
kW-mo/yr
|
$9.31 | |
| Electricity Fees | $91,596 | - |
|
- | |
| Natural Gas | $85,252 | 16,178 |
MMBtu
|
$5.27 | |
| Waste Disposal Costs | |||||
| Water Usage | $4,529 | 120 |
Tgal
|
$37.74 | |
| TOTAL YEARLY COSTS | $955,999 | ||||
| RECOMMENDED SAVINGS* | $7,715 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,906 | $17,664 |
$3,980
72,366
kWh
|
$926
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,152 | $4,060 |
$646
11,746
kWh
|
$506
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $692 | - |
$562
10,212
kWh
|
$130
-
kW-mo/yr
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $566 | $3,607 |
$459
8,351
kWh
|
$107
-
kW-mo/yr
|
- | |
| 05 | 2.7224: Reduce space conditioning during non-working hours | $399 | $3,550 |
$146
2,661
kWh
|
$37
-
kW-mo/yr
|
$216
-
MMBtu
|
|
| TOTAL RECOMMENDED | $7,715 | $28,881 |
$5,793
105,336
kWh
|
$1,706
-
kW-mo/yr
|
$216
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs