ITAC Assessment: UD1116
ITAC logo
ITAC Assessment: UD1116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Fabricated Metal
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 70,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 2,483
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,232 609,211
kWh
Electricity Demand $16,861 2,405
kW-mo/yr
Electricity Fees $1,999 -
Natural Gas $22,690 5,203
MMBtu
Waste Disposal Costs
Water Usage $1,045 224
Tgal
Water Disposal $1,137 224
Tgal
TOTAL YEARLY COSTS $124,964
RECOMMENDED SAVINGS* $23,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $1,791 - $1,286
9,648
kWh
$505
-
kW-mo/yr
- -
02 2.6212: Turn off equipment during breaks, reduce operating time $9,462 $15,035 $9,462
70,986
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,126 $5,813 $3,250
24,379
kWh
$876
-
kW-mo/yr
- -
04 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $2,842 $908 $652
4,888
kWh
- - $2,190
-
MMBtu
05 2.6231: Utilize controls to operate equipment only when needed $251 - $251
1,880
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,166 $5,318 $1,727
12,952
kWh
$439
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $712 $1,015 $559
4,194
kWh
$153
-
kW-mo/yr
- -
08 2.3212: Optimize plant power factor $1,999 $5,700 - - $1,999 -
TOTAL RECOMMENDED $23,349 $33,789 $17,187
128,927
kWh
$1,973
-
kW-mo/yr
$1,999 $2,190
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs