Assessment Year | 1990 |
---|---|
Principal Product | PLASTIC BOTTLES |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 25,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $671,688 | 9,699,883 |
kWh
|
$0.069 |
Natural Gas | $23,891 | 4,626 |
MMBtu
|
$5.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,773 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,852 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $16,073 | $10,868 |
$16,073
232,122
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,837 | $16,000 |
$13,837
199,883
kWh
|
- | |
03 | 2.8113: Purchase gas directly from a contract gas supplier | $10,055 | $500 | - |
$10,055
-
MMBtu
|
|
04 | 2.7226: Use computer programs to optimize hvac performance | $1,011 | $1,600 |
$1,011
14,654
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,748 | $758 |
$4,748
68,581
kWh
|
- | |
06 | 2.3132: Recharge batteries on during off-peak demand periods | $2,820 | - |
$2,820
-
kWh
|
- | |
07 | 2.7261: Install timers and/or thermostats | $147 | $1,000 | - |
$147
-
MMBtu
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $2,082 | $1,600 |
$2,082
30,188
kWh
|
- | |
TOTAL RECOMMENDED | $50,773 | $32,326 |
$40,571
545,428
kWh
|
$10,202
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,852 | $3,858 |
$9,650
98,769
kWh
|
$10,202
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs