Assessment Year | 2014 |
---|---|
Principal Product | Signs and Advertising Specialities |
NAICS | 339950: Sign Manufacturing |
SIC | 3993: Signs and Advertising Specialties |
Sales Range | $1 M to 5M |
# of Employees | 60 |
Plant Area |
44,000
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 3,380
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $96,330 | 317,920 |
kWh
|
$0.30 |
Electricity Fees | $3,653 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,953 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,345 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.2628: Utilize a less expensive cooling method | $15,014 | $15,970 |
$15,014
49,550
kWh
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,675 | $13,660 |
$8,675
28,629
kWh
|
|
03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $8,603 | $9,480 |
$8,603
28,393
kWh
|
|
04 | 2.7135: Install occupancy sensors | $8,441 | $1,119 |
$8,441
27,858
kWh
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,648 | $1,660 |
$5,648
18,640
kWh
|
|
06 | 2.6218: Turn off equipment when not in use | $5,358 | $3,100 |
$5,358
17,683
kWh
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,434 | $1,320 |
$4,434
14,633
kWh
|
|
08 | 2.7145: Install skylights | $3,405 | $1,140 |
$3,405
11,239
kWh
|
|
09 | 2.4239: Eliminate or reduce compressed air usage | $2,166 | $2,200 |
$2,166
7,149
kWh
|
|
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $700 | $8 |
$700
2,310
kWh
|
|
11 | 2.6127: Maintain air filters by cleaning or replacement | $509 | $347 |
$509
1,680
kWh
|
|
TOTAL RECOMMENDED | $62,953 | $50,004 |
$62,953
207,764
kWh
|
||
TOTAL IMPLEMENTED | $44,345 | $35,864 |
$44,345
146,350
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs