ITAC Assessment: LL0122
ITAC logo
ITAC Assessment: LL0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Salt
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area
n/a
Annual Production 2,500,000
ton
Production Hrs. Annual 6,800
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,338,482 24,125,767
kWh
Electricity Demand $389,118 69,238
kW-mo/yr
Electricity Fees $73,810 -
Natural Gas $62,675 10,633
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,373 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,684

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7145: Install skylights $3,305 $1,737 $2,464
44,415
kWh
$714
-
kW-mo/yr
$127 -
02 2.3212: Optimize plant power factor $113,313 $117,135 n/a - $108,955
-
kW-mo/yr
$4,358 -
03 2.2511: Insulate bare equipment $5,071 $5,224 - - - $5,071
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,898 $660 $2,787
50,241
kWh
- $111 -
05 2.7134: Use photocell controls $8,786 $495 $8,448
152,280
kWh
- $338 -
TOTAL RECOMMENDED $133,373 $125,251 $13,699
246,936
kWh
$109,669
-
kW-mo/yr
$4,934 $5,071
-
MMBtu
TOTAL IMPLEMENTED $11,684 $1,155 $11,235
202,521
kWh
- $449 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs