Assessment Year | 2006 |
---|---|
Principal Product | processed meat |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $50 M to 100M |
# of Employees | 330 |
Plant Area |
180,000
ft2
|
Annual Production | 70,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $600,067 | 16,657,200 |
kWh
|
$0.036 |
Electricity Demand | $455,297 | 3,059 |
kW-mo/yr
|
$148.84 |
Electricity Fees | $1,457 | - |
|
- |
Natural Gas | $1,360,263 | 133,052 |
MMBtu
|
$10.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,936 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,748 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $781 | $25 |
$472
13,104
kWh
|
$309
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,228 | $600 |
$3,160
87,608
kWh
|
$2,068
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $302 | $3,899 |
$180
4,992
kWh
|
$122
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,836 | $4,661 |
$1,715
47,610
kWh
|
$1,121
-
kW-mo/yr
|
- | |
05 | 2.7122: Disconnect ballasts | $810 | $83 |
$490
13,603
kWh
|
$320
-
kW-mo/yr
|
- | |
06 | 2.2447: Heat water with exhaust heat | $57,298 | $18,000 | - | - |
$57,298
-
MMBtu
|
|
07 | 2.1213: Direct warmest air to combustion intake | $6,338 | $500 | - | - |
$6,338
-
MMBtu
|
|
08 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $2,234 | $1,702 | - | - |
$2,234
-
MMBtu
|
|
09 | 2.2163: Use minimum steam operating pressure | $2,109 | $25 | - | - |
$2,109
-
MMBtu
|
|
TOTAL RECOMMENDED | $77,936 | $29,495 |
$6,017
166,917
kWh
|
$3,940
-
kW-mo/yr
|
$67,979
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,748 | $11,445 |
$5,545
153,813
kWh
|
$3,631
-
kW-mo/yr
|
$8,572
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs