Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Computer Peripheral Equipment
NAICS
n/a
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 113
Plant Area 36,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,426 985,053
kWh
Electricity Demand $27,558 3,412
kW-mo/yr
Electricity Fees $8,432 -
Natural Gas $2,508 388
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,286 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,226

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $93 $261 $83
1,172
kWh
$10
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $685 $1,425 $551
7,913
kWh
$134
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,312 $60 $857
12,309
kWh
$455
-
kW-mo/yr
- - -
04 2.7232: Replace existing hvac unit with high efficiency model $9,122 $6,600 $7,975
113,716
kWh
$1,147
-
kW-mo/yr
- - -
05 2.7261: Install timers and/or thermostats $1,755 $1,650 $1,755
24,912
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,282 $16,054 $6,387
91,149
kWh
$2,895
-
kW-mo/yr
- - -
07 3.6192: Use a less expensive method of waste removal $2,400 $30 - - - $2,400 -
08 4.522: Modify storage space to avoid rental of a warehouse $2,880 $6,150 - - - $2,880 -
09 4.212: Adopt in-house material generation $4,757 $805 - - $(-48.0)
-
Tgal
$4,940 $(-135.0)
TOTAL RECOMMENDED $32,286 $33,035 $17,608
251,171
kWh
$4,641
-
kW-mo/yr
$(-48.0)
-
Tgal
$10,220 $(-135.0)
TOTAL IMPLEMENTED $22,226 $15,295 $10,587
150,937
kWh
$1,602
-
kW-mo/yr
$(-48.0)
-
Tgal
$10,220 $(-135.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings