ITAC Assessment: AM0844
ITAC logo
ITAC Assessment: AM0844
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Frozen Taquitos and Tacos
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 375
Plant Area 131,000
ft2
Annual Production 47,000,000
lb
Production Hrs. Annual 5,134
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,348,953 17,074,800
kWh
Electricity Demand $587 3,529
kW-mo/yr
Natural Gas $345,434 90,193
MMBtu
Waste Disposal Costs
Water Usage $239,725 45,986
Tgal
TOTAL YEARLY COSTS $1,934,699
RECOMMENDED SAVINGS* $147,901 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $117,732

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $101,477 $114,525 $101,477
1,284,525
kWh
-
02 3.4151: Minimize water usage $30,169 $3,770 $(-3,431.0)
(-43,435)
kWh
$33,600
-
Tgal
03 2.6218: Turn off equipment when not in use $9,263 $3,900 $9,263
117,256
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $6,138 $331 $6,138
77,695
kWh
-
05 2.7135: Install occupancy sensors $854 $625 $854
10,810
kWh
-
TOTAL RECOMMENDED $147,901 $123,151 $114,301
1,446,851
kWh
$33,600
-
Tgal
TOTAL IMPLEMENTED $117,732 $119,381 $117,732
1,490,286
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs