Assessment Year | 2025 |
---|---|
Principal Product | PVC vinyl drywall finishing materials |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3449: Miscellaneous Structural Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 74 |
Plant Area |
84,000
ft2
|
Annual Production | 12,000,000
lb
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $184,297 | 3,422,600 |
kWh
|
$0.054 |
Electricity Demand | $142,534 | 9,292 |
kW-mo/yr
|
$15.34 |
Electricity Fees | $55,876 | - |
|
- |
TOTAL YEARLY COSTS | $382,707 | |||
RECOMMENDED SAVINGS* | $116,418 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,097 | - |
$3,097
57,354
kWh
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $14,250 | - | - |
$14,250
-
kW-mo/yr
|
|
03 | 2.7221: Lower temperature during the winter season and vice-versa | $11,875 | $210 |
$4,865
90,096
kWh
|
$7,010
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $31,692 | $1,185 |
$21,229
393,134
kWh
|
$10,463
-
kW-mo/yr
|
|
05 | 2.4224: Upgrade controls on compressors | $42,932 | $22,088 |
$25,538
472,926
kWh
|
$17,394
-
kW-mo/yr
|
|
06 | 2.7229: Air condition only space necessary | $4,597 | $5,600 |
$2,480
45,931
kWh
|
$2,117
-
kW-mo/yr
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,975 | $22,686 |
$4,738
87,735
kWh
|
$3,237
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $116,418 | $51,769 |
$61,947
1,147,176
kWh
|
$54,471
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs