ITAC Assessment: OK0423
ITAC logo
ITAC Assessment: OK0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Millwork, Doors, Cabinets, Furniture
NAICS
n/a
SIC 2431: Millwork
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 49,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,110 325,909
kWh
Natural Gas $9,977 2,661
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $1,501 $5,000 n/a $1,501
20,516
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $1,402 $2,800 n/a - $1,402
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $901 $3,906 n/a $901
6,448
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $662 - n/a $662
9,379
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $296 - n/a $296
4,103
kWh
-
06 2.2437: Recover waste heat from equipment $266 $880 n/a - $266
-
MMBtu
TOTAL RECOMMENDED $5,028 $12,586 $3,360
40,446
kWh
$1,668
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs