ITAC Assessment: UU0287
ITAC logo
ITAC Assessment: UU0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Navigation Devices
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $100
M
to 500
M
# of Employees 680
Plant Area 278,000
ft2
Annual Production 12,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $486,750 14,427,717
kWh
Electricity Demand $504,692 26,574
kW-mo/yr
Electricity Fees $421,083 -
Natural Gas $307,695 25,846
MMBtu
Waste Disposal Costs
Water Usage $264,111 9,173
Tgal
TOTAL YEARLY COSTS $1,984,331
RECOMMENDED SAVINGS* $251,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.3141: Use battery storage for demand control $54,000 $20,000 - - $54,000 - -
02 2.3191: Use demand controller or load shedder $40,400 $39,000 - - $40,400 - -
03 2.8114: Change rate schedules or other changes in utility service $16,300 $2,160 - - - $16,300
-
MMBtu
-
04 2.3511: Use plant owned transformers or lease transformers $7,500 $10,500 - - $31,500 - $(-24,000.0)
05 2.9114: Use solar heat to make electricty $32,200 $261,000 $11,900
354,000
kWh
$20,300
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $75,500 $160,000 $34,000
1,020,000
kWh
$41,500
-
kW-mo/yr
- - -
07 2.4239: Eliminate or reduce compressed air usage $11,700 $11,700 $10,140
301,000
kWh
$1,560
-
kW-mo/yr
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,100 $5,900 $3,100
92,300
kWh
- - - -
09 2.2511: Insulate bare equipment $3,100 $5,260 $670
20,000
kWh
- - $2,430
-
MMBtu
-
10 2.6218: Turn off equipment when not in use $8,070 $4,800 $8,070
240,000
kWh
- - - -
TOTAL RECOMMENDED $251,870 $520,320 $67,880
2,027,300
kWh
$63,360
-
kW-mo/yr
$125,900 $18,730
-
MMBtu
$(-24,000.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs