Assessment Year | 2025 |
---|---|
Principal Product | Navigation Devices |
NAICS | 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur |
SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
Sales Range | $100 M to 500M |
# of Employees | 680 |
Plant Area |
278,000
ft2
|
Annual Production | 12,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $486,750 | 14,427,717 |
kWh
|
$0.034 | |
Electricity Demand | $504,692 | 26,574 |
kW-mo/yr
|
$18.99 | |
Electricity Fees | $421,083 | - |
|
- | |
Natural Gas | $307,695 | 25,846 |
MMBtu
|
$11.90 | |
Waste Disposal Costs | |||||
Water Usage | $264,111 | 9,173 |
Tgal
|
$28.79 | |
TOTAL YEARLY COSTS | $1,984,331 | ||||
RECOMMENDED SAVINGS* | $251,870 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3141: Use battery storage for demand control | $54,000 | $20,000 | - | - | $54,000 | - | - | |
02 | 2.3191: Use demand controller or load shedder | $40,400 | $39,000 | - | - | $40,400 | - | - | |
03 | 2.8114: Change rate schedules or other changes in utility service | $16,300 | $2,160 | - | - | - |
$16,300
-
MMBtu
|
- | |
04 | 2.3511: Use plant owned transformers or lease transformers | $7,500 | $10,500 | - | - | $31,500 | - | $(-24,000.0) | |
05 | 2.9114: Use solar heat to make electricty | $32,200 | $261,000 |
$11,900
354,000
kWh
|
$20,300
-
kW-mo/yr
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $75,500 | $160,000 |
$34,000
1,020,000
kWh
|
$41,500
-
kW-mo/yr
|
- | - | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $11,700 | $11,700 |
$10,140
301,000
kWh
|
$1,560
-
kW-mo/yr
|
- | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,100 | $5,900 |
$3,100
92,300
kWh
|
- | - | - | - | |
09 | 2.2511: Insulate bare equipment | $3,100 | $5,260 |
$670
20,000
kWh
|
- | - |
$2,430
-
MMBtu
|
- | |
10 | 2.6218: Turn off equipment when not in use | $8,070 | $4,800 |
$8,070
240,000
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $251,870 | $520,320 |
$67,880
2,027,300
kWh
|
$63,360
-
kW-mo/yr
|
$125,900 |
$18,730
-
MMBtu
|
$(-24,000.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs