ITAC Assessment: UD0071
ITAC logo
ITAC Assessment: UD0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product POWDERED METAL PARTS
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,400 4,384,818
kWh
Natural Gas $20,875 4,549
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,364

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,990 $627 $1,990
39,566
kWh
02 2.7494: Install storm windows and doors $1,451 $2,000 $1,451
31,067
kWh
03 2.7492: Use proper thickness of insulation on building envelope $2,364 $3,680 $2,364
50,410
kWh
04 2.2437: Recover waste heat from equipment $6,519 $40,000 $6,519
138,921
kWh
TOTAL RECOMMENDED $12,324 $46,307 $12,324
259,964
kWh
TOTAL IMPLEMENTED $2,364 $3,680 $2,364
50,410
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs