Assessment Year | 1997 |
---|---|
Principal Product | Heat Transfer Products |
NAICS |
n/a
|
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
75,000
ft2
|
Annual Production | 42,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,379 | 950,762 |
kWh
|
$0.071 |
Electricity Demand | $21,338 | 2,571 |
kW-mo/yr
|
$8.30 |
Natural Gas | $6,624 | 1,091 |
MMBtu
|
$6.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $116,978 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,278 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,363 | $2,363 |
$1,691
23,740
kWh
|
$672
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,392 | - |
$1,052
14,947
kWh
|
$340
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,773 | $6,741 |
$1,366
19,343
kWh
|
$407
-
kW-mo/yr
|
- | - | - | |
04 | 2.7144: Install spectral reflectors / delamp | $744 | $1,190 |
$571
7,913
kWh
|
$173
-
kW-mo/yr
|
- | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $22,100 | $9,000 | - | - | - | $22,100 | - | |
06 | 3.8224: Convert to less toxic hydrocarbon cleaners | $2,462 | - | - | - |
$2,462
-
gal
|
- | - | |
07 | 3.7134: Wash and reuse rags on-site | $1,262 | $1,600 | - | - | - | - | $1,262 | |
08 | 4.441: Install automatic packing equipment | $25,182 | $9,000 | - | - | - | $25,182 | - | |
09 | 4.511: Expand operations into unused space | $22,500 | $49,750 | - | - | - | $22,500 | - | |
10 | 4.321: Optimize production lot sizes and inventories | $37,200 | $24,000 | - | - | - | $37,200 | - | |
TOTAL RECOMMENDED | $116,978 | $103,644 |
$4,680
65,943
kWh
|
$1,592
-
kW-mo/yr
|
$2,462
-
gal
|
$106,982 | $1,262 | ||
TOTAL IMPLEMENTED | $57,278 | $29,894 |
$4,680
65,943
kWh
|
$1,592
-
kW-mo/yr
|
$2,462
-
gal
|
$47,282 | $1,262 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs