ITAC Assessment: AM0057
ITAC logo
ITAC Assessment: AM0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FURNITURE FOR CHURCHES
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $1
M
to 5
M
# of Employees 98
Plant Area
n/a
Annual Production 76
thousand feet
Production Hrs. Annual 2,159
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,831 1,301,876
kWh
Natural Gas $22,362 5,359
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,403

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings
01 3.6123: Burn wood by-products for heat $7,900 $29,000 - $13,300
-
MMBtu
$(-3,200.0)
-
MMBtu
$(-2,200.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $655 $242 $655
9,379
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,710 $2,406 $1,710
24,326
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $680 $540 $680
22,567
kWh
- - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $478 - $478
-
kWh
- - -
06 2.4312: Improve lubrication practices $283 - $283
9,379
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $68 $62 $68
1,172
kWh
- - -
TOTAL RECOMMENDED $11,774 $32,250 $3,874
66,823
kWh
$13,300
-
MMBtu
$(-3,200.0)
-
MMBtu
$(-2,200.0)
TOTAL IMPLEMENTED $1,403 $844 $1,403
33,118
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs