Assessment Year | 1994 |
---|---|
Principal Product | Air Cannons, Industrial Vibrators and Flow Aid Devices |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
145,572
ft2
|
Annual Production | 165,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $176,558 | 2,407,093 |
kWh
|
$0.073 |
Natural Gas | $6,722 | 1,613 |
MMBtu
|
$4.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,012 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,755 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,475 | $22,315 |
$6,475
88,218
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,194 | $4,456 |
$2,194
29,894
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $1,322 | $150 |
$1,322
18,171
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $1,870 | $3,200 |
$1,870
25,498
kWh
|
- | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $3,894 | $1,000 |
$3,894
53,048
kWh
|
- | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $41,565 | $17,500 |
$61,285
835,580
kWh
|
$(-19,720.0)
-
MMBtu
|
|
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,035 | $6,000 |
$2,035
27,843
kWh
|
- | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $23,657 | $62,000 |
$31,913
435,229
kWh
|
$(-8,256.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $83,012 | $116,621 |
$110,988
1,513,481
kWh
|
$(-27,976.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,755 | $31,121 |
$15,755
214,829
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs