ITAC Assessment: LT8442
ITAC logo
ITAC Assessment: LT8442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product S.E.T (Surface Enhancement Technology) Wear Materials
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 86,865
ft2
Annual Production 15,000
units
Production Hrs. Annual 2,548
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,769 278,370
kWh
Electricity Demand $20,470 2,363
kW-mo/yr
Natural Gas $284 7
MMBtu
LPG $3,177 132
MMBtu
Other Gas $11,597 357
MMBtu
Waste Disposal Costs
Other Liquid (non-haz) $2,893 1
gal
TOTAL YEARLY COSTS $69,191
RECOMMENDED SAVINGS* $150,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.426: Modify workload $6,666 $9,600 - - $426
-
MMBtu
$6,240 - -
02 4.515: Install shelves / racks to utilize unused space $140,000 $32,760 - - - - - $140,000
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $474 $132 $428
3,893
kWh
$46
-
kW-mo/yr
- - - -
04 2.6218: Turn off equipment when not in use $3,161 $918 $2,485
22,593
kWh
$659
-
kW-mo/yr
- - $17 -
TOTAL RECOMMENDED $150,301 $43,410 $2,913
26,486
kWh
$705
-
kW-mo/yr
$426
-
MMBtu
$6,240 $17 $140,000
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs