ITAC Assessment: CW0116
ITAC logo
ITAC Assessment: CW0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Graphite and Carbon Products
NAICS 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 36
Plant Area 696,960
ft2
Annual Production 100,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,987 534,428
kWh
Electricity Demand $35,275 4,793
kW-mo/yr
Natural Gas $11,000 856
MMBtu
TOTAL YEARLY COSTS $86,262
RECOMMENDED SAVINGS* $9,404 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,374

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $342 $1,350 $342
3,153
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $752 $70 $752
6,930
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $138 $90 $138
1,272
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $46 - $46
426
kWh
-
05 2.7491: Insulate glazing, walls, ceilings, and roofs $4,030 $19,360 - $4,030
-
MMBtu
06 2.4112: Install soft-start to eliminate nuisance trips $3,657 $2,615 $3,657
51,803
kWh
-
07 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $438 - $438
6,204
kWh
-
TOTAL RECOMMENDED $9,404 $23,485 $5,374
69,789
kWh
$4,030
-
MMBtu
TOTAL IMPLEMENTED $1,374 $160 $1,374
14,832
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs