Assessment Year | 2021 |
---|---|
Principal Product | Graphite and Carbon Products |
NAICS | 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing |
SIC | 3299: Nonmetallic Mineral Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 36 |
Plant Area |
696,960
ft2
|
Annual Production | 100,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $39,987 | 534,428 |
kWh
|
$0.075 |
Electricity Demand | $35,275 | 4,793 |
kW-mo/yr
|
$7.36 |
Natural Gas | $11,000 | 856 |
MMBtu
|
$12.85 |
TOTAL YEARLY COSTS | $86,262 | |||
RECOMMENDED SAVINGS* | $9,404 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,374 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $342 | $1,350 |
$342
3,153
kWh
|
- | |
02 | 2.4322: Use or replace with energy efficient substitutes | $752 | $70 |
$752
6,930
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $138 | $90 |
$138
1,272
kWh
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $46 | - |
$46
426
kWh
|
- | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $4,030 | $19,360 | - |
$4,030
-
MMBtu
|
|
06 | 2.4112: Install soft-start to eliminate nuisance trips | $3,657 | $2,615 |
$3,657
51,803
kWh
|
- | |
07 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $438 | - |
$438
6,204
kWh
|
- | |
TOTAL RECOMMENDED | $9,404 | $23,485 |
$5,374
69,789
kWh
|
$4,030
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,374 | $160 |
$1,374
14,832
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs