ITAC Assessment: UU0295
ITAC logo
ITAC Assessment: UU0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Fabricated Structural and Architectural Metal
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 16,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,480 210,312
kWh
Electricity Demand $36,143 1,506
kW-mo/yr
Electricity Fees $2,595 -
Natural Gas $4,852 742
MMBtu
Fuel Oil #1 $51,725 2,020
MMBtu
Fuel Oil #2 $20,780 770
MMBtu
TOTAL YEARLY COSTS $129,575
RECOMMENDED SAVINGS* $552,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
01 3.2176: Increase use of automation $108,218 $1,740,000 $(-2,640.0)
(-40,000)
kWh
$(-5,760.0)
-
kW-mo/yr
$116,618
02 3.2176: Increase use of automation $108,218 $717,000 $(-2,640.0)
(-40,000)
kWh
$(-5,760.0)
-
kW-mo/yr
$116,618
03 3.2176: Increase use of automation $104,580 $436,000 $(-132.0)
(-2,000)
kWh
$(-288.0)
-
kW-mo/yr
$105,000
04 4.111: Add equipment/ operators to reduce production bottleneck $117,621 $572,000 $(-91.4)
(-1,385)
kWh
$1,094
-
kW-mo/yr
$116,618
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,215 $2,600 $2,215
33,550
kWh
- -
06 4.112: Replace old machine with new automatic multi-station tool $67,000 $366,000 - - $67,000
07 2.4321: Upgrade obsolete equipment $29,987 $230,300 $259
3,920
kWh
$1,728
-
kW-mo/yr
$28,000
08 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $15,103 $291,632 $347
5,250
kWh
$2,016
-
kW-mo/yr
$12,740
TOTAL RECOMMENDED $552,941 $4,355,532 $(-2,683.2)
(-40,665)
kWh
$(-6,969.6)
-
kW-mo/yr
$562,594
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs