ITAC Assessment: UU0266
ITAC logo
ITAC Assessment: UU0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product structural metal bridge supports
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 110,000
ft2
Annual Production 320
units
Production Hrs. Annual 4,800
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,659 2,363,120
kWh
Electricity Demand $142,813 8,790
kW-mo/yr
Electricity Fees $60,268 -
Natural Gas $47,910 3,856
MMBtu
LPG $180,955 8,234
MMBtu
TOTAL YEARLY COSTS $516,605
RECOMMENDED SAVINGS* $107,112 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Administrative Changes Savings
01 2.7232: Replace existing hvac unit with high efficiency model $15,681 $22,500 - - $(-81,976.0)
-
MMBtu
$97,657
-
MMBtu
-
02 2.7231: Use radiant heater for spot heating $8,217 $13,000 - - $(-2,643.0)
-
MMBtu
$10,860
-
MMBtu
-
03 2.1321: Replace fossil fuel equipment with electrical equipment $52,801 $18,500 $(-24.0)
(-670)
kWh
- - $65,158
-
MMBtu
$(-12,333.0)
04 2.4226: Use / purchase optimum sized compressor $15,500 $38,200 $7,500
208,500
kWh
$8,000
-
kW-mo/yr
- - -
05 2.4239: Eliminate or reduce compressed air usage $5,730 $6,960 $5,730
160,190
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $633 $543 $633
17,690
kWh
- - - -
07 2.3212: Optimize plant power factor $8,550 $22,000 - $8,550
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $107,112 $121,703 $13,839
385,710
kWh
$16,550
-
kW-mo/yr
$(-84,619.0)
-
MMBtu
$173,675
-
MMBtu
$(-12,333.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs