ITAC Assessment: CM1040
ITAC logo
ITAC Assessment: CM1040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Structural Steel Fabrication
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 204,778
ft2
Annual Production 50,621,172
lb
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,542 1,800,765
kWh
Electricity Demand $163,832 7,953
kW-mo/yr
Electricity Fees $31,891 -
Natural Gas $56,227 8,009
MMBtu
Waste Disposal Costs
Water Usage $9,800 867
Tgal
TOTAL YEARLY COSTS $342,291
RECOMMENDED SAVINGS* $90,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $56,304 $898,804 $53,008
1,185,871
kWh
$3,296
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,963 $111 $1,880
42,065
kWh
$2,083
-
kW-mo/yr
- -
03 2.7442: Keep doors and windows shut when not on use $25,870 $19,927 $978
21,861
kWh
- $24,892
-
MMBtu
-
04 2.2514: Cover open tanks $646 $528 $646
14,442
kWh
- - -
05 2.4133: Use most efficient type of electric motors $993 $8,820 $455
10,181
kWh
$538
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $355 $797 $122
2,746
kWh
$233
-
kW-mo/yr
- -
07 2.7491: Insulate glazing, walls, ceilings, and roofs $288 $552 - - $288
-
MMBtu
-
08 2.2136: Install / repair insulation on steam lines $151 $1,347 - - $151
-
MMBtu
-
09 2.8113: Purchase gas directly from a contract gas supplier $2,282 $800 - - - $2,282
TOTAL RECOMMENDED $90,852 $931,686 $57,089
1,277,166
kWh
$6,150
-
kW-mo/yr
$25,331
-
MMBtu
$2,282
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs