Assessment Year | 1986 |
---|---|
Principal Product | DIES,METAL STAMPINGS |
NAICS |
n/a
|
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,832 | 790,445 |
kWh
|
$0.086 |
Natural Gas | $9,994 | 2,419 |
MMBtu
|
$4.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,834 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,919 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $17,707 | $200 |
$14,185
165,299
kWh
|
$3,522
-
MMBtu
|
- | |
02 | 2.2437: Recover waste heat from equipment | $472 | - | - |
$472
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,519 | $3,765 |
$2,519
29,308
kWh
|
- | - | |
04 | 2.1123: Install automatic stack damper | $702 | $1,100 | - |
$702
-
MMBtu
|
- | |
05 | 2.4312: Improve lubrication practices | $568 | $100 |
$568
6,741
kWh
|
- | - | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $486 | $400 | - |
$486
-
MMBtu
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $365 | - | - |
$565
-
MMBtu
|
$(-200.0) | |
08 | 2.6124: Establish equipment maintenance schedule | $308 | - |
$408
4,689
kWh
|
- | $(-100.0) | |
09 | 2.4312: Improve lubrication practices | $284 | $300 |
$284
3,224
kWh
|
- | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $210 | $50 |
$210
2,345
kWh
|
- | - | |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $213 | - |
$213
2,345
kWh
|
- | - | |
TOTAL RECOMMENDED | $23,834 | $5,915 |
$18,387
213,951
kWh
|
$5,747
-
MMBtu
|
$(-300.0) | ||
TOTAL IMPLEMENTED | $22,919 | $4,815 |
$18,174
211,606
kWh
|
$5,045
-
MMBtu
|
$(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs