| Assessment Year | 1999 |
|---|---|
| Principal Product | Custom glass to metal sealing, soldering and brazing |
| NAICS |
n/a
|
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 60 |
| Plant Area |
14,280
ft2
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 2,375
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $49,079 | 520,223 |
kWh
|
$0.094 |
| Electricity Demand | $12,254 | 1,648 |
kW-mo/yr
|
$7.44 |
| LPG | $8,329 | 930 |
MMBtu
|
$8.96 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,338 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,784 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Gaseous Waste Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $1,280 | $2,110 |
$(-81.0)
(-879)
kWh
|
$(-34.0)
-
kW-mo/yr
|
- |
$1,395
-
lb
|
- | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $642 | $30 |
$437
4,689
kWh
|
$205
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $3,142 | $980 |
$(-54.0)
(-586)
kWh
|
$(-17.0)
-
kW-mo/yr
|
$3,213
-
MMBtu
|
- | - | |
| 04 | 4.424: Improve space comfort conditioning | $5,656 | $11,874 |
$(-189.0)
(-2,052)
kWh
|
$(-316.0)
-
kW-mo/yr
|
- | - | $6,161 | |
| 05 | 4.212: Adopt in-house material generation | $5,618 | $29,750 |
$(-3,438.0)
(-37,222)
kWh
|
$(-1,527.0)
-
kW-mo/yr
|
- |
$10,583
-
lb
|
- | |
| TOTAL RECOMMENDED | $16,338 | $44,744 |
$(-3,325.0)
(-36,050)
kWh
|
$(-1,689.0)
-
kW-mo/yr
|
$3,213
-
MMBtu
|
$11,978
-
lb
|
$6,161 | ||
| TOTAL IMPLEMENTED | $3,784 | $1,010 |
$383
4,103
kWh
|
$188
-
kW-mo/yr
|
$3,213
-
MMBtu
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs