Assessment Year | 1999 |
---|---|
Principal Product | Custom glass to metal sealing, soldering and brazing |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
14,280
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,079 | 520,223 |
kWh
|
$0.094 |
Electricity Demand | $12,254 | 1,648 |
kW-mo/yr
|
$7.44 |
LPG | $8,329 | 930 |
MMBtu
|
$8.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,338 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,784 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Gaseous Waste Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $1,280 | $2,110 |
$(-81.0)
(-879)
kWh
|
$(-34.0)
-
kW-mo/yr
|
- |
$1,395
-
lb
|
- | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $642 | $30 |
$437
4,689
kWh
|
$205
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $3,142 | $980 |
$(-54.0)
(-586)
kWh
|
$(-17.0)
-
kW-mo/yr
|
$3,213
-
MMBtu
|
- | - | |
04 | 4.424: Improve space comfort conditioning | $5,656 | $11,874 |
$(-189.0)
(-2,052)
kWh
|
$(-316.0)
-
kW-mo/yr
|
- | - | $6,161 | |
05 | 4.212: Adopt in-house material generation | $5,618 | $29,750 |
$(-3,438.0)
(-37,222)
kWh
|
$(-1,527.0)
-
kW-mo/yr
|
- |
$10,583
-
lb
|
- | |
TOTAL RECOMMENDED | $16,338 | $44,744 |
$(-3,325.0)
(-36,050)
kWh
|
$(-1,689.0)
-
kW-mo/yr
|
$3,213
-
MMBtu
|
$11,978
-
lb
|
$6,161 | ||
TOTAL IMPLEMENTED | $3,784 | $1,010 |
$383
4,103
kWh
|
$188
-
kW-mo/yr
|
$3,213
-
MMBtu
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs