ITAC Assessment: LT8414
ITAC logo
ITAC Assessment: LT8414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fabricated structural steel and misc. metals
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 7699: Repair Shops and Related Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area 297,400
ft2
Annual Production 500
units
Production Hrs. Annual 2,285
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,270 124,204
kWh
Electricity Demand $14,410 1,683
kW-mo/yr
Natural Gas $2,095 45
MMBtu
Waste Disposal Costs
Water Usage $483 54
Tgal
Water Disposal $590 54
Tgal
TOTAL YEARLY COSTS $34,848
RECOMMENDED SAVINGS* $14,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,971 $4,893 $1,490
10,717
kWh
$482
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $293 $533 $222
1,594
kWh
$72
-
kW-mo/yr
-
03 2.9114: Use solar heat to make electricty $12,072 $57,222 $12,072
86,852
kWh
- -
04 4.211: Consider use / purchase of bulk materials where possible $179 - - - $179
TOTAL RECOMMENDED $14,516 $62,648 $13,784
99,162
kWh
$553
-
kW-mo/yr
$179
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs