Assessment Year | 2016 |
---|---|
Principal Product | Industrial Coatings Resins |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2812: Alkalies and Chlorine |
Sales Range | $10 M to 50M |
# of Employees | 27 |
Plant Area |
116,950
ft2
|
Annual Production | 48,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $253,536 | 2,980,713 |
kWh
|
$0.085 |
Natural Gas | $126,891 | 42,216 |
MMBtu
|
$3.01 |
TOTAL YEARLY COSTS | $380,427 | |||
RECOMMENDED SAVINGS* | $13,631 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,290 | $500 |
$1,290
18,863
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $1,462 | $1,750 |
$1,462
21,504
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $696 | $2,500 |
$696
10,239
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,519 | $5,500 |
$8,519
125,278
kWh
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $1,664 | $3,435 | - |
$1,664
-
MMBtu
|
|
TOTAL RECOMMENDED | $13,631 | $13,685 |
$11,967
175,884
kWh
|
$1,664
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs