ITAC Assessment: UM0471
ITAC logo
ITAC Assessment: UM0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Industrial Coatings Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2812: Alkalies and Chlorine
Sales Range $10
M
to 50
M
# of Employees 27
Plant Area 116,950
ft2
Annual Production 48,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,536 2,980,713
kWh
Natural Gas $126,891 42,216
MMBtu
TOTAL YEARLY COSTS $380,427
RECOMMENDED SAVINGS* $13,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,290 $500 $1,290
18,863
kWh
-
02 2.7135: Install occupancy sensors $1,462 $1,750 $1,462
21,504
kWh
-
03 2.2511: Insulate bare equipment $696 $2,500 $696
10,239
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,519 $5,500 $8,519
125,278
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $1,664 $3,435 - $1,664
-
MMBtu
TOTAL RECOMMENDED $13,631 $13,685 $11,967
175,884
kWh
$1,664
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs