Assessment Year | 2025 |
---|---|
Principal Product | Structural Steel Fabrication |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 124 |
Plant Area |
187,600
ft2
|
Annual Production | 11,712
ton
|
Production Hrs. Annual | 6,048
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $181,705 | 1,739,600 |
kWh
|
$0.10 |
Electricity Demand | $32,218 | 5,781 |
kW-mo/yr
|
$5.57 |
Electricity Fees | $26,998 | - |
|
- |
Natural Gas | $60,273 | 5,917 |
MMBtu
|
$10.19 |
Fuel Oil #1 | $26,272 | 921 |
MMBtu
|
$28.53 |
TOTAL YEARLY COSTS | $327,466 | |||
RECOMMENDED SAVINGS* | $257,405 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $24,319 | $2,741 |
$24,226
242,261
kWh
|
$93
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,637 | $15,000 |
$22,254
212,958
kWh
|
$2,383
-
kW-mo/yr
|
- | - | |
03 | 2.9114: Use solar heat to make electricty | $60,995 | $262,084 |
$55,177
528,014
kWh
|
$5,818
-
kW-mo/yr
|
- | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $16,531 | $210,600 | - | - |
$16,531
-
MMBtu
|
- | |
05 | 2.4322: Use or replace with energy efficient substitutes | $88,305 | $146,250 | - | - | - |
$88,305
-
MMBtu
|
|
06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $9,630 | $149,864 | - | - | - |
$9,630
-
MMBtu
|
|
07 | 2.4321: Upgrade obsolete equipment | $32,988 | $55,500 |
$32,700
312,984
kWh
|
$288
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $257,405 | $842,039 |
$134,357
1,296,217
kWh
|
$8,582
-
kW-mo/yr
|
$16,531
-
MMBtu
|
$97,935
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs