ITAC Assessment: NC0486
ITAC logo
ITAC Assessment: NC0486
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Paperboard cartons
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 102,000
ft2
Annual Production 250,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,551 3,644,100
kWh
Electricity Demand $85,250 9,175
kW-mo/yr
Electricity Fees $8,706 -
Natural Gas $6,772 785
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,145 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,365 $4,000 $1,037
24,617
kWh
$328
-
kW-mo/yr
02 2.7111: Reduce illumination to minimum necessary levels $150 $25 $102
2,419
kWh
$48
-
kW-mo/yr
03 2.7135: Install occupancy sensors $2,878 $4,661 $2,878
68,292
kWh
-
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,752 $4,400 $1,203
28,561
kWh
$549
-
kW-mo/yr
TOTAL RECOMMENDED $6,145 $13,086 $5,220
123,889
kWh
$925
-
kW-mo/yr
TOTAL IMPLEMENTED $1,515 $4,025 $1,139
27,036
kWh
$376
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs