Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Plastic caps/ plastic injection & compression molding
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 137
Plant Area 275,000
ft2
Annual Production 6,441,815,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,314,898 36,445,976
kWh
Electricity Demand $1,465,109 64,117
kW-mo/yr
Electricity Fees $254,234 -
Natural Gas $27,706 4,168
MMBtu
Other Gas $5,863 1
MMBtu
Waste Disposal Costs
Water Usage $76,216 7,213
Tgal
Water Disposal $14,987 1,349
Tgal
TOTAL YEARLY COSTS $4,159,012
RECOMMENDED SAVINGS* $185,622 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $9,710 $17,820 $6,460
101,730
kWh
$3,250
-
kW-mo/yr
02 2.7135: Install occupancy sensors $387 $600 $200
3,145
kWh
$188
-
kW-mo/yr
03 2.3141: Use battery storage for demand control $44,744 $200,990 $(-618.7)
9,743
kWh
$45,363
-
kW-mo/yr
04 2.4239: Eliminate or reduce compressed air usage $34,861 $175,256 $19,459
306,442
kWh
$15,402
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,025 $9,461 $5,855
92,206
kWh
$1,170
-
kW-mo/yr
06 2.3132: Recharge batteries on during off-peak demand periods $3,791 - - $3,791
-
kW-mo/yr
07 2.7221: Lower temperature during the winter season and vice-versa $4,576 $1,000 $3,863
60,840
kWh
$713
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $80,528 $87,635 $47,541
748,684
kWh
$32,986
-
kW-mo/yr
TOTAL RECOMMENDED $185,622 $492,763 $82,760
1,322,790
kWh
$102,862
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -