Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product fabricated steel storage tanks and oilfield equipment
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 1,900,000
ft2
Annual Production 750
units
Production Hrs. Annual 2,530
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,500 1,023,000
kWh
Electricity Demand $66,200 6,600
kW-mo/yr
Electricity Fees $49,950 -
Natural Gas $7,135 664
MMBtu
Other Energy $133,900 6,048
MMBtu
TOTAL YEARLY COSTS $313,685
RECOMMENDED SAVINGS* $99,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $86,006 $120,000 $(-25,894.0)
(-470,800)
kWh
$(-22,000.0)
-
kW-mo/yr
$133,900
-
MMBtu
02 2.5194: Redesign process $7,085 $34,585 $3,805
69,175
kWh
$3,280
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $5,300 $8,620 - $5,300
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $841 $166 $377
6,854
kWh
$464
-
kW-mo/yr
-
05 2.4314: Use synthetic lubricant $295 $166 $132
2,405
kWh
$163
-
kW-mo/yr
-
TOTAL RECOMMENDED $99,527 $163,537 $(-21,580.0)
(-392,366)
kWh
$(-12,793.0)
-
kW-mo/yr
$133,900
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs