| Assessment Year | 2024 |
|---|---|
| Principal Product | fabricated steel storage tanks and oilfield equipment |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $50 M to 100M |
| # of Employees | 180 |
| Plant Area |
1,900,000
ft2
|
| Annual Production | 750
units
|
| Production Hrs. Annual | 2,530
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $56,500 | 1,023,000 |
kWh
|
$0.055 |
| Electricity Demand | $66,200 | 6,600 |
kW-mo/yr
|
$10.03 |
| Electricity Fees | $49,950 | - |
|
- |
| Natural Gas | $7,135 | 664 |
MMBtu
|
$10.75 |
| Other Energy | $133,900 | 6,048 |
MMBtu
|
$22.14 |
| TOTAL YEARLY COSTS | $313,685 | |||
| RECOMMENDED SAVINGS* | $99,527 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $86,006 | $120,000 |
$(-25,894.0)
(-470,800)
kWh
|
$(-22,000.0)
-
kW-mo/yr
|
$133,900
-
MMBtu
|
|
| 02 | 2.5194: Redesign process | $7,085 | $34,585 |
$3,805
69,175
kWh
|
$3,280
-
kW-mo/yr
|
- | |
| 03 | 2.3212: Optimize plant power factor | $5,300 | $8,620 | - |
$5,300
-
kW-mo/yr
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $841 | $166 |
$377
6,854
kWh
|
$464
-
kW-mo/yr
|
- | |
| 05 | 2.4314: Use synthetic lubricant | $295 | $166 |
$132
2,405
kWh
|
$163
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $99,527 | $163,537 |
$(-21,580.0)
(-392,366)
kWh
|
$(-12,793.0)
-
kW-mo/yr
|
$133,900
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs